Connectivity to Mumbai
REACH
- Mandwa Jetty (Ferry from Gateway of Mumbai)~45 min ferry
- Mumbai via Atal Setu / Coastal RoadUpcoming faster route
- Navi Mumbai & PanvelVia Mumbai–Goa Highway
- PuneDirect road access via highway
Bagmala, Alibag
Survey No. 51/6 & 121/5, Opposite HP Petrol Pump, Bagmala — with direct access via the Alibag–Revdanda Road.
Direct entry off the Alibag–Revdanda Road, with a 9 m wide internal road network within the community.
The Mumbai Trans Harbour Link (Atal Setu), Virar–Alibag multi-modal corridor and coastal road upgrades are reshaping Alibag's accessibility — translating directly into long-term land appreciation.

Schedule
Walk the master-planned layout, see the plot demarcations and feel the calm of Bagmala, Alibag.